ATI Advanced TechInstallations Book a Site Review
Hunter Valley vineyard 150kW solar and 215kWh AI battery — ATI

Agriculture · Hunter Valley, NSW

Hunter Vineyard — 150kW + 215kWh

150kW
Solar
215kWh
AI battery
Hunter Valley
NSW · location
Agriculture
Sector

About this project

A 150kW solar system paired with a 215kWh AI-controlled battery for a Hunter Valley vineyard — a complete solar-plus-storage setup on a working agricultural site.

Solar covers the daytime load; the battery stores the surplus and dispatches it when power is dearest, run by ATI's AI energy-arbitrage control. It's the difference between simply making power and choosing the best moment to use it.

Designed and installed in-house by ATI, to CEC and SAA accreditation standards.

Estimated performance

~210 MWh
Est. annual generation
~$40k–$50k
Est. annual electricity savings
~145 t
Est. CO₂ avoided / year

Figures are indicative estimates only — based on roughly 1,400 kWh per kW each year for NSW and typical commercial grid electricity rates. Actual generation and savings depend on the site's load profile, tariff and how much of the energy is used on-site, and are confirmed by a formal site review.

Have a site like this?

We design, install and deliver commercial solar, battery and AI-driven energy systems Australia-wide — in-house, no subcontractors. A site review models your real load and tariff to show what's actually worth it.

Book a Site Review

More: see all projects · read our guides